UK electricity demand and generation
The British electricity system day by day: demand outturn and generation by fuel from gas, nuclear, wind and imports (Elexon); national and transmission demand, embedded wind and solar and the flow on every interconnector to France, Belgium, the Netherlands, Norway, Denmark and Ireland (NESO); the carbon intensity of each unit generated and the fuel mix behind it (NESO); and total solar PV generation (PV_Live).
| Indicator | 22-11-2026 | 21-11-2026 | 20-11-2026 | 19-11-2026 | 18-11-2026 | 17-11-2026 | 16-11-2026 | 15-11-2026 | 14-11-2026 | 13-11-2026 | 12-11-2026 | 11-11-2026 | 10-11-2026 | 09-11-2026 | 08-11-2026 | 07-11-2026 | 06-11-2026 | 05-11-2026 | 04-11-2026 | 03-11-2026 | 02-11-2026 | 01-11-2026 | 31-10-2026 | 30-10-2026 | 29-10-2026 | 28-10-2026 | 27-10-2026 | 26-10-2026 | 25-10-2026 | 24-10-2026 | 23-10-2026 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Demand and generation by fuel (Elexon)2 | ||||||||||||||||||||||||||||||||
| Initial demand outturn | 30,703.96 | 31,338.54 | 33,666.77 | 34,119.73 | 33,365.13 | 32,258.1 | 33,454.88 | 30,741.46 | 30,145.08 | 33,335.96 | 31,587.06 | 32,517.63 | 32,859.48 | 32,300.23 | 29,363.75 | 29,366.35 | 31,597.38 | 31,897.33 | 31,247.9 | 30,586.52 | 29,843 | 27,511.25 | 26,332.79 | 27,816.44 | 29,114.38 | 28,596.54 | 26,701.58 | 29,350.75 | 23,771.36 | 26,928.08 | 28,701.88 | |
| Generation by fuel20 | ||||||||||||||||||||||||||||||||
| Combined cycle gas turbine | 7,635.21 | 13,053.53 | 15,799.42 | 14,911.06 | 11,864.15 | 8,786.1 | 10,856.54 | 8,493.85 | 7,001.83 | 10,259.27 | 8,595.44 | 19,025.31 | 22,085.77 | 22,563.69 | 20,668.79 | 20,594.27 | 19,891.33 | 15,383.79 | 14,482.75 | 13,774.83 | 11,782.71 | 11,376.02 | 12,448.92 | 14,002.19 | 16,853.98 | 9,933.52 | 5,839.17 | 5,009.73 | 3,932.04 | 4,083.1 | 4,080 | |
| Nuclear | 5,133.31 | 5,132.83 | 5,133.71 | 5,129.4 | 5,131.63 | 5,131.52 | 5,131.54 | 5,129.58 | 5,130.4 | 5,131.44 | 5,127.23 | 5,106.25 | 5,130.25 | 5,129 | 5,127.17 | 5,127.98 | 5,128.46 | 5,066.15 | 5,125.79 | 5,126.25 | 5,093.92 | 5,124.21 | 5,128.44 | 5,115.38 | 5,113.33 | 5,104.4 | 5,090.88 | 5,082.56 | 5,064.54 | 5,037.94 | 4,989.13 | |
| Wind | 9,924.99 | 2,974.09 | 3,995.88 | 8,411.83 | 7,470.5 | 13,121.96 | 8,492.29 | 8,405.92 | 9,576.15 | 8,510.31 | 12,067.63 | 4,636.77 | 3,053.79 | 738.29 | 599.46 | 1,016.04 | 2,779.96 | 8,698.29 | 8,793.58 | 8,321.77 | 9,501.31 | 4,429.58 | 2,710.83 | 5,916.54 | 3,865.33 | 10,014.08 | 14,027.79 | 14,139.73 | 11,425.08 | 14,177.31 | 11,062.08 | |
| Biomass | 2,121.64 | 2,680.51 | 2,688.23 | 1,850.85 | 2,007.92 | 1,909.65 | 2,373.71 | 2,160.17 | 2,423.31 | 2,998.38 | 3,093.38 | 3,225.38 | 3,252.44 | 3,224.56 | 2,959.48 | 3,096.06 | 3,274.06 | 3,285.17 | 3,287.58 | 3,178.52 | 3,311.04 | 3,330.58 | 3,320.27 | 3,302.31 | 3,284.02 | 3,139.21 | 2,399.9 | 2,539.25 | 950.13 | 917.56 | 2,543.54 | |
| Coal | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Hydro (non-pumped storage) | 248.17 | 309.3 | 425.6 | 318.19 | 350.56 | 348.48 | 363.92 | 338.13 | 237.6 | 333.6 | 259.81 | 386.92 | 431.71 | 593.21 | 392.88 | 439.35 | 562.35 | 455.27 | 443.88 | 524.94 | 626.04 | 727.48 | 677.94 | 698.92 | 800.35 | 756.63 | 636.29 | 637.54 | 511.63 | 566.6 | 605.15 | |
| Pumped storage | 215.24 | 374.44 | 604.48 | 132 | 629.5 | 304.11 | 466.62 | 371.5 | 156 | 375.83 | 160.25 | 537.1 | 586.72 | 658.79 | 479 | 662 | 532.92 | 392.75 | 151.75 | 311.71 | 341.6 | 193.74 | 244.44 | 82.6 | 261.73 | 393.76 | 422.59 | 579.4 | 786.21 | 477.33 | 510.83 | |
| Open cycle gas turbine | 0 | 1.69 | 28.83 | 2.4 | 18.73 | 1.44 | 20.9 | 8.5 | 0.54 | 49.79 | 1.54 | 54.85 | 212.42 | 301.56 | 11.71 | 10.52 | 157.13 | 115.67 | 3.98 | 6.88 | 2.35 | 0 | 3.83 | 8.63 | 11.85 | 12.1 | 6.52 | 4.06 | 19.58 | 22.79 | 0.71 | |
| Oil | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Other | 721.36 | 733.93 | 883.4 | 754.9 | 766.58 | 729.58 | 897.83 | 648.27 | 803.69 | 1,035.92 | 1,031.65 | 987.6 | 1,113 | 1,181.4 | 722.25 | 734.15 | 974.02 | 913.06 | 795.9 | 832.27 | 885.9 | 650.65 | 675.31 | 1,017.92 | 960.06 | 1,148 | 860.06 | 863.44 | 843.35 | 838.4 | 774.67 | |
| Interconnector — France (IFA) | 1,001.72 | 997.32 | 1,003 | 1,003.17 | 998.8 | 992.81 | 988.71 | 999.29 | 907.5 | 998.75 | 416.59 | 369.67 | 166.77 | 293 | 256.08 | 229.2 | 275.56 | 142.5 | 243.5 | 307.4 | 294.9 | 363.52 | 316.39 | 345.76 | 291.78 | 299.54 | 218.67 | 633.26 | 560.61 | 1,913.14 | ||
| Interconnector — France (IFA2) | 987.09 | 982.53 | 992.13 | 992.38 | 992.83 | 993.33 | 963.21 | 990.63 | 857.63 | 984.96 | 835.33 | 700.88 | 140 | 401.31 | 338.62 | 331.08 | 558.92 | 318.75 | 253.5 | 573.4 | 536.08 | 620.95 | 582.73 | 695.75 | 566.67 | 636.8 | 742.27 | 576.06 | 433.71 | 978.45 | ||
| Interconnector — Netherlands (BritNed) | 851.81 | 1,046.87 | 947.64 | 944.05 | 1,042.67 | 875.95 | 932.21 | 993.58 | 689.92 | 911.33 | 689.94 | 32 | 0.08 | 0.17 | 0.13 | 0.17 | 0.04 | 10.74 | 503.13 | 320.6 | 436.5 | 24.6 | 727.21 | 582 | 671.61 | 852.59 | ||||||
| Interconnector — Belgium (Nemo) | 965.89 | 979.77 | 846.42 | 903.25 | 984.96 | 924.68 | 982.13 | 989.88 | 651.33 | 855.67 | 600.5 | 47 | 97.67 | 26 | 312.82 | 246 | 397.58 | 385 | 502.94 | 361.27 | 234.25 | 503.53 | 178.7 | 0 | 0 | 0 | 0 | 320.63 | 397.42 | 760.93 | 899.43 | |
| Interconnector — Ireland (Moyle) | 84.49 | 139.33 | 111.86 | 30.67 | 43 | 22.18 | 168.96 | 38.86 | 65.03 | 115.5 | 80.5 | 90.54 | 47 | 84.86 | 45.08 | 184.13 | ||||||||||||||||
| Interconnector — Ireland (East-West) | 29.7 | 29.44 | 0 | 0 | 0 | 0 | 4.61 | 0 | 0 | 0 | 0 | 0.78 | 9.74 | 0 | 0 | 0 | 0 | 0 | 0 | 22.57 | 23.67 | 1.14 | 0.27 | 0.52 | 7 | 44.27 | 34.72 | |||||
| Interconnector — Norway (North Sea Link) | 1,071.96 | 1,371.13 | 1,147.32 | 919.84 | 1,368.88 | 828.65 | 1,307.21 | 1,396.33 | 1,400 | 1,400 | 1,141.63 | 1,154.14 | 1,300.08 | 1,389 | 1,400 | 1,400 | 1,358.46 | 1,391 | 1,369.08 | 1,297.42 | 1,400 | 1,400 | 1,400 | 1,400 | 1,400 | 1,389.25 | 864.73 | 1,108.14 | 839.05 | 233.43 | 1,180.48 | |
| Interconnector — France (ElecLink) | 993.65 | 989.54 | 1,002.04 | 1,001.21 | 1,001.54 | 1,000.54 | 960.25 | 995.79 | 789.13 | 997.33 | 707.71 | 698.08 | 304.16 | 493.06 | 453.31 | 267.46 | 535.46 | 210.67 | 248.16 | 444.07 | 309.13 | 593.88 | 568.31 | 547.73 | 520.09 | 431.58 | 298.4 | 634 | 549.86 | 676.14 | 19.27 | |
| Interconnector — Denmark (Viking Link) | 829.74 | 1,407.23 | 1,035.81 | 959.31 | 1,419.13 | 1,297 | 1,196.54 | 1,420.54 | 1,415.46 | 1,426 | 1,150.45 | 188.4 | 0 | 153.91 | 184.89 | 577.93 | 522.2 | 0 | 232 | 607.25 | 351.6 | 401.56 | 0 | 41 | 1,069.25 | 1,110.26 | 1,396.08 | 1,054.92 | 1,331.67 | 1,309.9 | ||
| Interconnector — Greenlink | 187.59 | 191.92 | 156.43 | 79.43 | 121.85 | 0 | 105.06 | 128.16 | 100.07 | 86.88 | 117.43 | 187.13 | 81.27 | 68.06 | 66.9 | 76.62 | ||||||||||||||||
| Demand, embedded generation and interconnectors (NESO)3 | ||||||||||||||||||||||||||||||||
| Demand5 | ||||||||||||||||||||||||||||||||
| National demand | 29,933.5 | 27,605.35 | 26,426.13 | 27,909.79 | 29,209.06 | 28,686.98 | 26,695.23 | 29,342.65 | 23,769.62 | 26,924.71 | 28,698.48 | |||||||||||||||||||||
| Transmission system demand | 32,268.56 | 29,036.31 | 27,922.98 | 30,997.42 | 32,496.6 | 32,018 | 29,657.58 | 31,020.69 | 24,738.4 | 27,989.06 | 29,755.5 | |||||||||||||||||||||
| England and Wales demand | 26,917.77 | 25,181.71 | 24,028.56 | 25,598.73 | 26,690.29 | 26,640.19 | 24,834.4 | 27,151.29 | 22,074.86 | 25,092.08 | 26,315.38 | |||||||||||||||||||||
| Pumped storage pumping | 326.23 | 23.46 | 24.92 | 333.1 | 45.77 | 223.96 | 430.98 | 285.79 | 500.24 | 439.6 | 185.42 | |||||||||||||||||||||
| Scottish transfer | -174.92 | 1,617.17 | 1,646.13 | 3,399.04 | 2,615.79 | 2,848.73 | 4,035.21 | 3,727.56 | 3,182.52 | 3,374.08 | 1,942.35 | |||||||||||||||||||||
| Embedded wind and solar4 | ||||||||||||||||||||||||||||||||
| Embedded wind generation | 1,214.65 | 657.92 | 535.52 | 1,222.81 | 884.02 | 2,438.85 | 4,263.06 | 3,712.73 | 4,633.74 | 3,895.19 | 2,939.1 | |||||||||||||||||||||
| Embedded wind capacity | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | 5,908 | |||||||||||||||||||||
| Embedded solar generation | 1,602.27 | 730.27 | 1,529.67 | 1,867.79 | 1,301.94 | 1,211.29 | 2,112.42 | 323.69 | 2,154.76 | 284.81 | 736.96 | |||||||||||||||||||||
| Embedded solar capacity | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | 25,014 | |||||||||||||||||||||
| Interconnector flows10 | ||||||||||||||||||||||||||||||||
| IFA (France) | -5.77 | 348.02 | 300.06 | -35.85 | -56.48 | -145.48 | -456.71 | -276.1 | 208.18 | 354.15 | 1,835.04 | |||||||||||||||||||||
| IFA2 (France) | 2.6 | 563.56 | 531.88 | -165.94 | -373.94 | -530.4 | -684.33 | -158.23 | 282.62 | 212.6 | 930.06 | |||||||||||||||||||||
| ElecLink (France) | 7.92 | 593.33 | 529.92 | -0.75 | -145.02 | -200.83 | -447.48 | 122.46 | 175.46 | 575.92 | -9.29 | |||||||||||||||||||||
| BritNed (Netherlands) | 5.85 | 222.83 | 229.73 | -814.04 | -794.92 | -399.29 | -419.5 | 495.81 | 537.92 | 658.94 | 741.83 | |||||||||||||||||||||
| Nemo Link (Belgium) | -187.19 | 280.98 | 170.46 | 0 | 0 | -222.17 | -462.67 | -198.17 | 237.14 | 670.58 | 863.06 | |||||||||||||||||||||
| North Sea Link (Norway) | 1,399.02 | 1,399.04 | 1,399.25 | 1,399.15 | 1,399.13 | 1,388.31 | 700.21 | 987.69 | 275 | -457.65 | 1,188.9 | |||||||||||||||||||||
| Viking Link (Denmark) | -256.96 | 216.48 | 237.79 | -819.4 | -750.48 | 446.92 | 1,086.67 | 1,395.15 | 1,039.8 | 1,355.52 | 933.58 | |||||||||||||||||||||
| Moyle (Northern Ireland to Scotland) | -229.73 | -157 | -232.13 | -38.63 | 67.48 | -150.58 | 12.5 | 40.02 | -52.68 | -45.13 | -57.6 | |||||||||||||||||||||
| East-West (Ireland) | 0 | 0 | -70.67 | -96.48 | 23.08 | -192.46 | -5.29 | -3.33 | -180.02 | -81.31 | -134.83 | |||||||||||||||||||||
| Greenlink (Ireland) | -513.33 | -459.25 | -513.79 | -130.69 | -16.33 | -323.15 | -86.88 | 1.25 | -75.96 | -94.38 | -228.4 | |||||||||||||||||||||
| Carbon intensity and generation mix (NESO)2 | ||||||||||||||||||||||||||||||||
| Carbon intensity, daily average | 118.92 | 193.56 | 205.13 | 180.21 | 160.73 | 113.31 | 144.67 | 130.63 | 112.12 | 145.08 | 117.9 | 214.63 | 245.38 | 260.98 | 259.73 | 256.4 | 238.38 | 179.13 | 168.58 | 165.75 | 146.75 | 170.71 | 189.16 | 179.63 | 209.19 | 132.54 | 80.48 | 81.13 | 72.31 | 73.71 | 81.02 | |
| Share of generation by fuel9 | ||||||||||||||||||||||||||||||||
| Wind | 35.17 | 11.78 | 13.05 | 25.18 | 25.27 | 41.66 | 28.08 | 30.17 | 34.83 | 26.18 | 37.86 | 15.14 | 10.54 | 3.53 | 2.25 | 3.52 | 8.85 | 26.83 | 28.11 | 26.81 | 30.54 | 16.56 | 10.9 | 20.54 | 13.68 | 34.6 | 51.55 | 51.21 | 51.52 | 55.14 | 42.79 | |
| Gas | 21.58 | 38.81 | 43.27 | 38.44 | 32.05 | 22.1 | 27.97 | 24.19 | 20.46 | 27.38 | 22.88 | 49.48 | 57.32 | 60.51 | 61.39 | 60.52 | 55.16 | 40.79 | 38.24 | 37.37 | 32.34 | 36.41 | 41.25 | 40.19 | 47.82 | 28.2 | 16.43 | 14.19 | 12.67 | 12.31 | 11.86 | |
| Nuclear | 15.22 | 15.73 | 14.39 | 13.66 | 14.47 | 13.49 | 14.13 | 15.43 | 15.51 | 14.09 | 14.1 | 13.61 | 13.31 | 13.64 | 15.31 | 15.11 | 14.15 | 13.62 | 14.02 | 14.36 | 14.53 | 16.91 | 17.25 | 14.84 | 14.65 | 14.38 | 14.38 | 14.86 | 16.24 | 15.64 | 15.02 | |
| Solar | 2 | 2.65 | 1.61 | 1.27 | 1.47 | 1.56 | 2.81 | 1.46 | 2.91 | 3.28 | 3.34 | 1.69 | 1.75 | 2.54 | 2.64 | 2.38 | 1.77 | 1.75 | 2.01 | 2.73 | 3 | 3.04 | 4.27 | 4.14 | 3.45 | 2.77 | 3.85 | 1.15 | 4.7 | 1.35 | 2.14 | |
| Biomass | 6.12 | 8.03 | 7.38 | 4.9 | 5.62 | 5.03 | 6.32 | 6.36 | 7.16 | 8.17 | 8.5 | 8.59 | 8.44 | 8.56 | 8.86 | 9.12 | 9.03 | 8.83 | 9.01 | 8.95 | 9.45 | 10.99 | 11.17 | 9.58 | 9.41 | 8.85 | 6.81 | 7.21 | 3.04 | 2.79 | 7.37 | |
| Hydro | 0.86 | 1.04 | 1.79 | 0.84 | 1.31 | 1.19 | 1.57 | 1.46 | 0.87 | 1.36 | 0.84 | 1.79 | 1.8 | 2.45 | 1.49 | 1.68 | 2.28 | 1.5 | 1.31 | 1.66 | 1.91 | 2.57 | 2.54 | 2.09 | 2.73 | 2.88 | 2.2 | 2.5 | 2.49 | 2.17 | 2.64 | |
| Coal | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| Interconnector imports | 17.07 | 19.77 | 16.24 | 13.87 | 17.85 | 13.12 | 16.87 | 19.17 | 15.95 | 16.88 | 9.84 | 7.25 | 4.14 | 5.82 | 6.12 | 5.58 | 6.17 | 4.42 | 5.29 | 5.96 | 5.92 | 11.6 | 10.53 | 5.82 | 5.65 | 5.25 | 2.41 | 6.44 | 6.85 | 8.13 | 15.95 | |
| Other | 1.95 | 2.17 | 2.28 | 1.85 | 1.96 | 1.86 | 2.25 | 1.74 | 2.31 | 2.65 | 2.64 | 2.46 | 2.69 | 2.95 | 1.95 | 2.09 | 2.59 | 2.24 | 2.03 | 2.15 | 2.3 | 1.91 | 2.09 | 2.8 | 2.6 | 3.06 | 2.37 | 2.42 | 2.51 | 2.47 | 2.24 | |
| Solar generation (PV_Live, University of Sheffield)3 | ||||||||||||||||||||||||||||||||
| Peak output | 3,936.84 | 8,276.78 | 6,169.5 | 3,427.22 | 3,849.41 | 4,774.02 | 8,848.83 | 2,918.92 | 7,859.6 | 10,226.9 | 10,442 | 3,950.22 | 3,755.73 | 3,916.81 | 3,073.8 | 5,187.8 | 2,953.2 | 1,564.87 | 2,937.33 | 5,817.79 | 7,094.47 | 3,226.88 | 7,090.72 | 8,655.86 | 6,225.72 | 5,892.52 | 8,969.27 | 1,383.55 | 9,452.24 | 1,290.62 | 3,067.79 | |
| Average output | 758.5 | 1,575.93 | 1,100.97 | 643.87 | 756.95 | 764.11 | 1,721.59 | 567.07 | 1,632.49 | 2,145.33 | 2,165.85 | 739.73 | 730.74 | 835.58 | 673.69 | 949.39 | 538.63 | 324.46 | 675.39 | 1,286.31 | 1,602.3 | 730.26 | 1,529.66 | 1,867.84 | 1,301.91 | 1,211.28 | 2,112.39 | 323.7 | 2,244.52 | 284.83 | 736.97 | |
| Daily energy | 18.2 | 37.82 | 26.42 | 15.45 | 18.17 | 18.34 | 41.32 | 13.61 | 39.18 | 51.49 | 51.98 | 17.75 | 17.54 | 20.05 | 16.17 | 22.79 | 12.93 | 7.79 | 16.21 | 30.87 | 38.46 | 17.53 | 36.71 | 44.83 | 31.25 | 29.07 | 50.7 | 7.77 | 53.87 | 6.84 | 17.69 |
Latest reading
The series on this page is daily and runs from Aug 1, 2025 to Nov 23, 2026. Source: Elexon (BMRS); National Energy System Operator (NESO) data portal; PV_Live — Sheffield Solar, University of Sheffield.
Look up any date
Pick a date between Jan 1, 2006 and Nov 23, 2026 to see every series in this table on that day. If there is no reading that day (weekend, holiday, or a weekly release), the last reading before it is shown.
About this data
The British electricity system day by day: demand outturn and generation by fuel from gas, nuclear, wind and imports (Elexon); national and transmission demand, embedded wind and solar and the flow on every interconnector to France, Belgium, the Netherlands, Norway, Denmark and Ireland (NESO); the carbon intensity of each unit generated and the fuel mix behind it (NESO); and total solar PV generation (PV_Live).
Frequently asked questions
- What is the latest figure for UK electricity demand and generation?
- Initial demand outturn stood at 29,351.12 MW on Nov 23, 2026. That is −4.4% from Nov 22, 2026 and +0.3% from a year earlier.
- How far back does the UK electricity demand and generation data go?
- The series on this page is daily and runs from Aug 1, 2025 to Nov 23, 2026. Source: Elexon (BMRS); National Energy System Operator (NESO) data portal; PV_Live — Sheffield Solar, University of Sheffield. Every series in the table can be charted over its full history and downloaded as CSV or Excel.
- What does this electricity dataset cover?
- It tracks daily electricity demand, generation by fuel type, embedded wind and solar output, interconnector flows and average carbon intensity across the Great Britain grid.
- What generation sources and interconnectors are included?
- Breakdowns include gas, nuclear, biomass, hydro, embedded wind and solar, alongside subsea interconnector flows connecting Britain with France, Belgium, Denmark and Ireland.
- What units are used across these series?
- Electricity demand and power output are reported in MW and GWh, generation shares in percentages, and grid carbon intensity in grams of carbon dioxide per kilowatt-hour.