MacroDataHub

France monthly non-wage hourly labour cost: construction

France monthly non-wage hourly labour cost: construction stood at 97 in Jun 2026, according to INSEE – Institut national de la statistique et des études économiques (BDM). It is one of the indicators in the Minimum wage and hourly labour cost table (Value · Monthly), with a complete series running from Dec 2008 to Jun 2026. The complete series with an interactive chart, free to download.

Source: INSEE – Institut national de la statistique et des études économiques (BDM)Last updated: Curated by Bui Thanh Phuc
Loading chart data…

This indicator in the Minimum wage and hourly labour cost table

Indicator06-202605-202604-202603-202602-202601-202612-202511-202510-202509-2025
Monthly hourly labour cost
Labour costs other than wages and salaries - Construction (NAF rev. 2, item F)97979797.297.297.297.397.397.396.9
Labour costs other than wages and salaries - Distributive trades (NAF rev. 2, item G)97.297.297.297.197.197.197.197.197.196.9

Understanding france monthly non-wage hourly labour cost: construction

Mandatory employer-paid outlays supplementary to direct wages for personnel assigned specifically to building construction projects are quantified by this monthly index. Included within this scope are social security contributions, statutory health and training levies, vocational taxes, and collective bargaining allowances borne entirely by firms operating within this particular industrial classification. Direct wages, production bonuses, and hours paid are strictly excluded, isolating purely the indirect financial obligations resting upon employers. When evaluated alongside sibling series covering trade or civil engineering subsectors, this measure captures the distinct collective contribution schedules and payroll tax frameworks applied exclusively to general building contractors.

Interpreting movements in this series requires attention to legislative adjustments in social contribution rates and periodic changes in collective agreements rather than shifts in hours worked or base pay. Initial monthly figures are subject to routine revisions as employers submit corrected social declarations and administrative corrections are processed by statistical compilers. Month-on-month comparisons can be distorted by seasonal variations in payroll levies, making twelve-month percentage changes preferable for analyzing underlying cost dynamics. Analysts should avoid comparing these auxiliary expenses directly with gross wage indices, as statutory contribution rates diverge significantly across different industrial classifications.

Frequently asked questions

What specific costs are included in this non-wage labour index?
It tracks employer-paid social contributions, statutory training levies, and industry-specific welfare taxes exclusive of direct wages.
Why should twelve-month comparisons be preferred over month-on-month analysis?
Annual comparisons remove the distortions caused by seasonal payroll tax adjustments and holiday bonus schedules.
How does this construction cost series differ from the civil engineering equivalent?
It applies strictly to building construction firms under specific classification codes, whereas civil engineering tracks infrastructure projects.

You may also be interested in