MacroDataHub

France minimum wage (SMIC) and labour costs

France minimum wage (SMIC) and hourly labor cost index monthly data from INSEE.

Source: INSEE – Institut national de la statistique et des études économiques (BDM)Last updated: Curated by Bui Thanh Phuc

Loading chart data…
Indicator11-202610-202609-202608-202607-202606-202605-202604-202603-202602-202601-202612-202511-202510-202509-202508-202507-202506-202505-202504-202503-202502-202501-202512-202411-202410-202409-202408-202407-202406-202405-202404-202403-202402-202401-202412-202311-2023
Gross interprofessional minimum wage (SMIC): percentage increase000002.4100001.18000000000000020000000001.1300
Employee social contribution rate for non-executives, excluding CSG and CRDS: for salaries below 1 Social Security ceiling11.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.3111.31
Social security contribution rate (employer’s share) for health, maternity, disability, and death insurance: for all wages up to 31/12/2018; for wages above 2.5 times the minimum wage (Smic) from 01/01/2019; for wages above 2.25 times the minimum wag13131313131313131313131313131313131313131313131313131313131313131313131313
Social security contribution rate (employer’s share) for old-age insurance: applied to the total salary2.112.112.112.112.112.112.112.112.112.112.112.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.022.021.91.9
Social security contribution rate (employer’s share) for old-age insurance: applied to the portion of the salary below 1 ceiling8.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.558.55
Unemployment insurance contribution rate (employer’s share): applied to the portion of the salary up to 4 ceilings44444444444444444444.054.054.054.054.054.054.054.054.054.054.054.054.054.054.054.054.054.05
Wage guarantee insurance (AGS) contribution rate (employer’s share): applied to the portion of the salary below 4 ceilings0.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.250.20.20.20.20.20.20.150.15
Social security contribution rate (employer’s share) for the employer’s contribution to the construction effort (PEEC): applied to the total salary (for companies with 20 employees or more until 2019, and 50 employees or more from 2020 onward)0.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.450.45
Social security contribution rate (employer’s share) for the National Housing Assistance Fund (Fnal): applied to the total salary (for companies with 20 employees or more until 2019, and 50 employees or more from 2020 onward)0.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.5
Social security contribution rate (employer’s share) for the apprenticeship tax: applied to the total salary0.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.680.68
Social security contribution rate (employer’s share) for the vocational training contribution: applied to the total salary (for companies with 20 or more employees until 2015, and with 11 or more employees from 2016 onward)1111111111111111111111111111111111111
Social security contribution rate (employee’s share) for health, maternity, disability, and death insurance: applied to the total salary0000000000000000000000000000000000000
Social security contribution rate (employee’s share) for old-age insurance: applied to the portion of the salary below 1 ceiling6.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.96.9
Unemployment insurance contribution rate (employee’s share): applied to the portion of the salary up to 4 ceilings0000000000000000000000000000000000000
Guaranteed minimum amount4.354.354.354.354.354.354.254.254.254.254.254.224.224.224.224.224.224.224.224.224.224.224.224.224.224.154.154.154.154.154.154.154.154.154.154.14.1
Amount of the gross hourly minimum wage (SMIC)12.3112.3112.3112.3112.3112.3112.0212.0212.0212.0212.0211.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.6511.6511.6511.6511.6511.6511.6511.6511.6511.6511.5211.52
Amount of the monthly Social Security ceiling4,0054,0054,0054,0054,0054,0054,0054,0054,0054,0054,0053,9253,9253,9253,9253,9253,9253,9253,9253,9253,9253,9253,9253,8643,8643,8643,8643,8643,8643,8643,8643,8643,8643,8643,8643,6663,666
Amount of the gross hourly minimum wage (SMIC) in the overseas departments (excluding Mayotte)12.3112.3112.3112.3112.3112.3112.0212.0212.0212.0212.0211.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.8811.6511.6511.6511.6511.6511.6511.6511.6511.6511.6511.5211.52
Social security contribution rate (employer’s share) for the Autonomy Solidarity Contribution (CSA): applied to the total salary0.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.30.3
Social security contribution rate (employee’s share) for old-age insurance: applied to the total salary0.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.4
Gross monthly amount of the minimum wage (SMIC) for 35 hours of work per week (151.67 hours per month)1,867.021,867.021,867.021,867.021,867.021,867.021,823.031,823.031,823.031,823.031,823.031,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,801.81,766.921,766.921,766.921,766.921,766.921,766.921,766.921,766.921,766.921,766.921,747.21,747.2
Net monthly amount of the minimum wage (SMIC) for 35 hours of work per week (151.67 hours per month), after deduction of CSG and CRDS1,477.931,477.931,477.931,477.931,477.931,477.931,443.111,443.111,443.111,443.111,443.111,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,426.31,398.691,398.691,398.691,398.691,398.691,398.691,398.691,398.691,398.691,398.691,383.081,383.08
Social security contribution rates (employer’s share) for retirement - APEC (executives): applied to the portion of the salary up to 4 ceilings0.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.040.04
Social security contribution rates (employee’s share) for retirement - APEC (executives): applied to the portion of the salary up to 4 ceilings0.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.02
Rate of the General Social Contribution (CSG) (employee’s share): applied to 98.25% of the gross salary9.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.29.2
Rate of the Contribution for the Repayment of Social Debt (CRDS) (employee’s share): applied to 98.25% of the gross salary0.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.50.5
Social security contribution rate (employer’s share) for family allowances: for wages above 3.5 times the minimum wage (Smic) until 31/12/2024, for wages above 3.3 times the minimum wage between 01/01/2025 and 31/12/2025, for all wages from 01/01/2025.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.255.25
Social security contribution rate (employee’s share) for the Agirc-Arrco supplementary pension scheme: tranche 1, applied to the portion of the salary up to 1 ceiling0.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.020.02
Supplementary pension contribution rate (employer’s share) for the Agirc-Arrco scheme: tranche 1, applied to the portion of the salary up to 1 ceiling4.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.724.72
Supplementary pension contribution rate (employer’s share) for the Agirc-Arrco scheme: tranche 2, applied to the portion of the salary between 1 and 8 ceilings12.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.9512.95
Supplementary pension contribution rate (employee’s share) for the Agirc-Arrco scheme: tranche 2, applied to the portion of the salary between 1 and 8 ceilings8.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.648.64
Supplementary pension: service value of the Agirc-Arrco point1.461.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.441.421.421.421.421.421.421.421.421.421.421.421.42
General balance contribution (CEG) rate (employer’s share) for the Agirc-Arrco scheme: tranche 1, applied to the portion of the salary up to 1 ceiling1.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.291.29
General balance contribution (CEG) rate (employer’s share) for the Agirc-Arrco scheme: tranche 2, applied to the portion of the salary between 1 and 8 ceilings1.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.621.62
General balance contribution (CEG) rate (employee’s share) for the Agirc-Arrco scheme: tranche 1, applied to the portion of the salary up to 1 ceiling0.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.860.86
General balance contribution (CEG) rate (employee’s share) for the Agirc-Arrco scheme: tranche 2, applied to the portion of the salary between 1 and 8 ceilings1.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.081.08
Technical balance contribution (CET) rate (employer’s share) for the Agirc-Arrco scheme: if the salary exceeds 1 ceiling, applied to the portion of the salary up to 8 ceilings0.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.210.21
Technical balance contribution (CET) rate (employee’s share) for the Agirc-Arrco scheme: if the salary exceeds 1 ceiling, applied to the portion of the salary up to 8 ceilings0.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.140.14
Gross hourly minimum wage (SMIC) in Mayotte9.569.569.569.569.569.569.339.339.339.339.338.988.988.988.988.988.988.988.988.988.988.988.988.988.988.88.88.88.88.88.88.88.88.88.88.78.7
Monthly hourly labour cost30
Total labour costs - Mechanical and electrical engineering industries (NAF rev. 2, items 25-30 32-33)148.5148.3148147.7147.5147.2146.9146.5146.2145.8145.4145144.6144.4144.1143.8143.5143.2142.8142.4141.9141.4141140.7140.3139.8139.3138.9138.5138.1137.6137.4
Total labour costs - Mining and quarrying (NAF rev. 2, item B)146.9146.6146.3146145.7145.4145.1144.6144.2143.8143.5143.3143.1142.8142.6142.4142.1141.7141.4140.9140.3139.7139.3138.9138.5137.6136.7135.8135.8135.7135.7135.4
Total labour costs - Manufacturing industry (NAF rev. 2, item C)146.9146.6146.3146145.7145.4145.1144.8144.4144143.6143.2142.9142.6142.3142.1141.7141.3141140.6140.2139.8139.4139138.6138.2137.7137.2136.8136.5136.1135.7
Total labour costs - Electricity, gas, steam and air conditioning supply (NAF rev. 2, item D)142.6142.4142.2142141.7141.4141.1141.1141.1141.1140.8140.5140.2140139.8139.7139.5139.3139.1138.6138.1137.5137.1136.7136.2136.2136.2136.1136.1136135.9135.5
Total labour costs - Water supply; sewerage, waste management and remediation activities (NAF rev. 2, item E)140.8140.6140.4140.1140139.9139.8139.6139.3139.1138.8138.4138.1137.9137.7137.5137.1136.7136.4136135.7135.3135134.6134.2133.8133.4133132.7132.4132.1131.7
Total labour costs - Construction (NAF rev. 2, item F)144.8144.6144.4144.2144143.8143.6143.1142.6142.1141.8141.5141.1140.8140.5140.2139.9139.7139.4139138.6138.2137.9137.5137.1136.8136.4136.1135.8135.6135.3135
Total labour costs - Distributive trades (NAF rev. 2, item G)140.7140.4140.2139.9139.7139.6139.4139.1138.8138.6138.3138137.8137.6137.4137.3137136.8136.6136.3136.1135.9135.6135.4135.2134.8134.4134133.8133.5133.2132.8
Total labour costs - Transportation and storage (NAF rev. 2, item H)138.7138.5138.2137.9137.7137.4137.1136.8136.6136.4136.1135.9135.7135.5135.4135.2135134.8134.6134.2133.7133.3132.9132.4132131.6131.2130.8130.4130129.7129.4
Total labour costs - Accommodation and catering (NAF rev. 2, item I)146.8146.7146.5146.3146.2146.1146145.8145.6145.4145.2145144.8144.7144.5144.3144.1143.8143.6143.4143.3143.1142.8142.5142.1141.8141.5141.2140.9140.6140.3139.9
Total labour costs - Information, communication (NAF rev. 2, item J)145.4145144.6144.2143.9143.5143.2142.8142.4142141.7141.3141140.6140.2139.9139.4139138.6138.2137.9137.5137.2136.9136.5136.3136135.7135.4135.1134.8134.5
Total labour costs - Financial and insurance activities (NAF rev. 2, item K)154.1153.7153.2152.8152.2151.6150.9150.7150.4150.2149.9149.7149.5149.2148.8148.4147.7147146.3146.1145.9145.8145.3144.8144.4144143.6143.2142.8142.3141.9141.5
Total labour costs - Real estate services (NAF rev. 2, item L)149.5149.2148.9148.6148.2147.9147.5147146.5146145.7145.4145.1144.7144.3144143.5143142.5142.5142.6142.7142.6142.6142.6142.7142.7142.8143.1143.3143.5143.6
Total labour costs - Professional, scientific and technical activities (NAF rev. 2, item M)139138.7138.5138.2137.9137.6137.4137.1136.8136.5136.3136135.8135.6135.4135.2134.9134.6134.3134.1133.8133.6133.2132.9132.6132.3132131.7131.4131.2130.9130.7
Total labour costs - Administrative and support service activities (NAF rev. 2, item N)144.9144.6144.2143.9143.7143.6143.5143.3143.1143142.9142.7142.6142.5142.4142.3142.1141.8141.5141.2140.8140.5140.1139.7139.3139138.6138.2137.7137.3136.8136.2
Labour costs other than wages and salaries - Accommodation and catering (NAF rev. 2, item I)100100100100100100100.2100.2100.210010010099.999.999.999.999.999.999.999.999.999.899.899.899.799.799.799.699.699.699.699.6
Labour costs other than wages and salaries - Information, communication (NAF rev. 2, item J)99.499.499.499.499.499.499.399.399.399.299.299.299999999999998.998.998.998.998.998.998.898.898.898.898.898.898.798.7
Labour costs other than wages and salaries - Financial and insurance activities (NAF rev. 2, item K)99.499.499.499.399.399.399.299.299.299999998.998.998.998.998.998.998.998.998.998.798.798.798.798.798.798.698.698.698.598.5
Labour costs other than wages and salaries - Mechanical and electrical engineering industries (NAF rev. 2, items 25-30 32-33)98.298.298.298.198.198.198.198.198.198989897.897.897.897.897.897.897.897.897.897.797.797.797.697.697.697.597.597.597.597.5
Labour costs other than wages and salaries - Real estate services (NAF rev. 2, item L)99.799.799.799.699.699.699.699.699.699.499.499.499.299.299.299.199.199.199999999999998.998.998.998.898.898.898.898.8
Labour costs other than wages and salaries - Professional, scientific and technical activities (NAF rev. 2, item M)99999998.998.998.998.998.998.998.798.798.798.598.598.598.598.598.598.598.598.598.498.498.498.398.398.398.398.398.398.398.3
Labour costs other than wages and salaries - Administrative and support service activities (NAF rev. 2, item N)96969696969696969695.895.895.895.795.795.795.895.895.895.795.795.795.795.795.795.595.595.595.495.495.495.395.3
Labour costs other than wages and salaries - Mining and quarrying (NAF rev. 2, item B)96.696.696.696.596.596.596.496.496.496.396.396.396.296.296.296.296.296.296.296.296.296.196.196.195.995.995.995.895.895.895.795.7
Labour costs other than wages and salaries - Manufacturing industry (NAF rev. 2, item C)97.797.797.797.697.697.697.697.697.697.497.497.497.297.297.297.297.297.297.297.297.297.197.197.197979796.996.996.996.996.9
Labour costs other than wages and salaries - Electricity, gas, steam and air conditioning supply (NAF rev. 2, item D)98.598.598.598.598.598.598.598.598.598.398.398.398.298.298.298.298.298.298.298.298.298.198.198.198.198.198.197.997.997.997.897.8
Labour costs other than wages and salaries - Water supply; sewerage, waste management and remediation activities (NAF rev. 2, item E)97.197.197.197.297.297.297.297.297.297.197.197.197979797979796.996.996.996.996.996.996.796.796.796.696.696.696.696.6
Labour costs other than wages and salaries - Construction (NAF rev. 2, item F)97979797.297.297.297.397.397.396.996.996.996.796.796.796.696.696.696.696.696.696.696.696.696.496.496.496.396.396.396.496.4
Labour costs other than wages and salaries - Distributive trades (NAF rev. 2, item G)97.297.297.297.197.197.197.197.197.196.996.996.996.896.896.896.896.896.896.896.896.896.796.796.796.696.696.696.696.696.696.696.6
Labour costs other than wages and salaries - Transportation and storage (NAF rev. 2, item H)96969696969696.196.196.195.995.995.995.995.995.995.995.995.995.995.995.995.795.795.795.695.695.695.495.495.495.495.4
Labour costs other than wages and salaries - Civil engineering (NAF rev. 2, item 42)98.298.298.298.498.498.498.598.598.598.398.398.398.198.198.198.198.198.198.198.198.198989897.997.997.997.797.797.797.797.7
Total labour costs - Civil engineering (NAF rev. 2, item 42)143.9143.6143.3143142.6142.2141.8141.1140.4139.7139.3139138.7138.4138137.6137.4137.2136.9136.5136.1135.7135.1134.6134133.7133.3132.9132.7132.5132.3132.1

Latest reading

The series on this page is monthly and runs from Jan 1951 to Nov 2026.

About this data

France minimum wage (SMIC) and hourly labor cost index monthly data from INSEE. This dataset tracks the gross and net monthly SMIC for 35 hours of work, alongside employer and employee social security contribution rates since 1930. It includes contribution rates for CSG, CRDS, and the Agirc-Arrco supplementary pension scheme. Total labor costs are also broken down by sector, such as construction and transportation.

Frequently asked questions

What is the latest figure for France minimum wage (SMIC) and labour costs?
Amount of the gross hourly minimum wage (SMIC) stood at 12.31 EUR in Nov 2026. That is unchanged from Oct 2026 and +3.6% from a year earlier.
How far back does the France minimum wage (SMIC) and labour costs data go?
The series on this page is monthly and runs from Jan 1951 to Nov 2026. Every series in the table can be charted over its full history and downloaded as CSV or Excel.
What is the SMIC in France and how is it calculated?
The SMIC (Salaire Minimum Interprofessionnel de Croissance) is the statutory minimum wage in France. It is defined as a gross hourly rate and a monthly rate based on the standard 35-hour workweek.
Which social security contributions are included in this French labor cost dataset?
The dataset includes employee and employer contribution rates for health, old-age, and unemployment insurance, alongside the CSG, CRDS, and Agirc-Arrco supplementary pension contributions.
Does the SMIC differ for French overseas territories?
Yes, the dataset tracks specific minimum wage rates for French overseas departments and Mayotte, which may differ from the standard rate applied in Metropolitan France.