MacroDataHub

France building index BT06: reinforced concrete structures

France building index BT06: reinforced concrete structures stood at 137 in Aug 2026, according to INSEE – Institut national de la statistique et des études économiques (BDM). It is one of the indicators in the Construction cost indices table (Value · Monthly), with a complete series running from Oct 2014 to Aug 2026. The complete series with an interactive chart, free to download.

Source: INSEE – Institut national de la statistique et des études économiques (BDM)Last updated: Curated by Bui Thanh Phuc
Loading chart data…

This indicator in the Construction cost indices table

Indicator08-202607-202606-202605-202604-202603-202602-202601-202612-202511-2025
Building index - BT06 - Framework, reinforced concrete structures - Base 2010137136.5136135.6135.8134.3133.5133132.2131.8
Building index - BT07 - Framework and metal frames - Base 2010152.8152.9150.8151.2150.4146.5144.6144.6143.8143.4
Building index - BT08 - Plaster and prefabricated plaster - Base 2010134134133.2132.8132.1130.7130.1129.5128.4128.6

Understanding france building index BT06: reinforced concrete structures

This statistical series monitors price shifts for structural frameworks and reinforced concrete building components, capturing the primary load-bearing skeleton of modern edifices. The compilation aggregates costs for reinforcing steel bars, ready-mix concrete, formwork timber, and the specialized labor required for on-site casting and structural assembly. It is distinct from masonry and general brickwork indices by focusing strictly on heavy load-bearing concrete architecture rather than partitioning walls or decorative block assemblies.

Analysts should read this measure alongside raw steel and cement commodity indicators to anticipate medium-term cost pressures in structural engineering. Seasonal slowdowns during winter months can impact pouring schedules, meaning annual comparisons provide a clearer picture of sustained cost trends than isolated monthly fluctuations. Revisions to early estimates occur when delayed contractor surveys are processed by statistical compilers.

Frequently asked questions

What core materials drive the movement of this index?
Ready-mix concrete, structural reinforcing steel, and timber used for formwork are the primary cost drivers.
Does this series include precast concrete elements?
Precast structural elements are captured here or in specialized structural groupings, whereas drainage pipes and basic blocks fall under separate masonry classifications.
Why might monthly figures be revised after initial publication?
Early estimates often rely on partial survey responses from contractors, which are subsequently updated when comprehensive pricing returns are processed.

You may also be interested in